Crystal Quest Authorized dealer

SKU: SWP-NV45B4FE3T

V-Flow Pump NV45-4S - Three-Phase Motor (3PH)

In stock
Regular price $6,209.99

Ships direct from the manufacturer · Shipping calculated at checkout Details

Returns within 30 days of delivery · 30% restocking fee Details

Questions? Talk to a water specialist

Overview

Configuration: Three-Phase Motor (3PH)

Product Description

The V-Flow Pump NV45-4S is a high-efficiency, four-stage vertical booster pump designed for industrial, commercial, and agricultural applications. Its vertical, in-line design saves space while delivering reliable performance in demanding environments.

Motor Options

  • Single-Phase Motor

    • Ideal for locations without three-phase power

    • Same flow (up to 45 GPM) and pressure (up to 232 PSI) as three-phase models

    • Slightly lower electrical efficiency and better suited for lighter duty cycles

  • Three-Phase Motor

    • Standard for commercial and industrial sites

    • Higher electrical efficiency and smoother continuous operation

This pump is well-suited for reverse osmosis, washing systems, water treatment, power plants, boiler systems, water boosting, irrigation systems, sprinkler systems, and hot and cold water circulation.

The V-Flow Pump NV45-4S combines precision engineering and dependable performance, making it a trusted choice for a wide range of water handling needs.

V-Flow Pump NV45-4S

Vertical Multistage Booster Pump – 304 Stainless Steel

Technical Specifications

Rated Flow 45 GPM
Stages 4
Max Working Pressure 232 PSI
Max Inlet Pressure 118 PSI
Motor Power 3 HP
Motor Phase / Frequency 1PH or 3PH / 60Hz
Motor Frame 182TC
Motor Enclosure T - TEFC
Pump Length (Flanged) 18.35 in
Weight (Flanged) 87 lbs

Construction Materials

Wetted Components 304 Stainless Steel
O-Rings EPDM
Mechanical Seal Silicon Carbide/Silicon Carbide/EPDM
Motor Bracket & Base Plate Cast Iron

Construction & Design Features (304 Stainless Steel Model)

Component Material (304 SS Models)
Motor Bracket Cast Iron
Pump Head 304 Stainless Steel
Impeller 304 Stainless Steel
Diffuser 304 Stainless Steel
Neck Ring Teflon
Shaft 431 Stainless Steel
Casing 304 Stainless Steel
O-Ring EPDM
Pump Base 304 Stainless Steel
Base Plate Cast Iron
Mechanical Seal Silicon Carbide/Silicon Carbide/EPDM

Installation Instructions

Installation Manual

Installation Instructions for V-Flow Pump NV45-4S

  1. Preparation:
    • Inspect the pump and motor for visible damage during shipping. Report any issues to the carrier or dealer immediately.
    • Ensure the installation site is level, stable, and provides adequate space and ventilation for motor cooling and maintenance.
    • Verify that the pump model and motor specifications match the system requirements and application.
  2. Mounting the Pump:
    • Secure the pump base to a flat, solid surface to minimize vibrations during operation.
    • Align and support the suction and discharge piping to prevent excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides for easier servicing and maintenance.
  3. Piping Connections:
    • Ensure piping matches the pump’s 2" ANSI 150# flanged connections.
    • Install gaskets to prevent leaks and ensure proper sealing.
    • Remove any protective covers or caps from the flanges before installation.
    • Include a bleed valve in the discharge line for hot water systems to relieve pressure during servicing.
  4. Electrical Connection:
    • Have a certified electrician verify the electrical supply matches the motor’s specifications (5 HP, three-phase).
    • Ensure correct motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
    • If rotation is incorrect, reverse any two leads on a three-phase motor to correct it.
  5. Priming the Pump:
    • Remove the fill plug and fill the pump casing with water using a funnel.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent and fill plugs once a steady stream of water flows from the vent.
  6. Initial Testing:
    • Fully open the suction valve and partially open the discharge valve.
    • Apply power to the motor and monitor for smooth operation without unusual noise or vibration.
    • Gradually open the discharge valve to achieve the desired operating conditions.
  7. Safety Precautions:
    • Never operate the pump without water to avoid damaging internal components.
    • Replace coupling guards after installation to ensure operator safety.
    • Ensure the pump is properly grounded and all connections are secure before starting.

Shipping, Warranty & Returns

Shipping is calculated at checkout by weight.

Orders ship direct from the manufacturer. We submit your order within 2 business days and email tracking as soon as it ships.

Estimated transit once shipped: 1–5 business days.

Alaska, Hawaii and Puerto Rico: ask us for a shipping quote.

Checkout offers this item to the contiguous 48 states and DC. For Alaska, Hawaii or Puerto Rico, use the shipping quote form or call 908-787-6030 and we reply by email with the delivered price. Nothing is charged until you accept.

Shipping details

1-year manufacturer warranty. We handle the claim for you from start to finish. Crystal Quest warranty terms

Start a warranty claim

Contact us for a Return Authorization (RMA) before sending anything back. We can't accept returns without one.

  • Start your return within 30 days of delivery. Approved returns carry a 30% restocking fee. Reverse osmosis systems, filter cartridges, membranes and media can't be returned.
  • Items must be unopened, unused and resellable, with all original packaging and components. You pay return shipping.
  • Systems, filters, cartridges and membranes can't be returned once water has run through them or they have been installed. Hygienic products can't be returned once opened.
  • Damaged or defective on arrival? Contact us within 48 hours with photos and we arrange the return.

Return terms for Crystal Quest

Documents & Manuals