Crystal Quest Authorized dealer

SKU: SWP-NV25B7FE1T

V-Flow Pump NV25-7S

In stock
Regular price $4,669.99

Ships direct from the manufacturer · Shipping calculated at checkout Details

Returns within 30 days of delivery · 30% restocking fee Details

Questions? Talk to a water specialist

Overview

Product Description

The SWP V-Flow Pump NV25-7S Vertical Pump is a compact and efficient multistage booster pump designed for high-demand industrial, commercial, and agricultural applications. Its vertical, in-line design saves space while providing exceptional reliability and performance.

Equipped with a 2 HP motor, the V-Flow Pump NV25-7S delivers a flow rate of up to 25 GPM and can handle pressures up to 362 PSI. Constructed with durable 304 stainless steel components, this pump ensures corrosion resistance and long-lasting operation in a wide range of environments. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections make installation and servicing simple and efficient.

Certified to meet NSF/ANSI 61 and 372 standards, this pump is ideal for applications such as reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and irrigation.

V-Flow Pump NV25-7S

Vertical Multistage Booster Pump – 304 Stainless Steel

Technical Specifications
Rated Flow 25 GPM
Stages 7
Max Working Pressure 362 PSI
Max Inlet Pressure 150 PSI
Motor Power 2 HP
Motor Phase / Frequency 1PH / 60Hz
Motor Frame 56C
Motor Enclosure T - TEFC
Pump Length (Flanged) 17.40 in
Weight (Flanged) 45 lbs

Construction & Design Features (304 Stainless Steel Model)

Component Material (304 SS Models)
Motor Bracket Cast Iron
Pump Head 304 Stainless Steel
Impeller 304 Stainless Steel
Diffuser 304 Stainless Steel
Neck Ring Teflon
Shaft 431 Stainless Steel
Casing 304 Stainless Steel
O-Ring EPDM
Pump Base 304 Stainless Steel
Base Plate Cast Iron
Mechanical Seal Silicon Carbide/Silicon Carbide/EPDM

Installation Instructions

Installation Manual

Installation Instructions for V-Flow Pump NV25-7S Vertical Pump

  1. Preparation:
    • Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer.
    • Ensure the installation site is level, stable, and provides adequate ventilation for motor cooling and servicing.
    • Verify that the pump model matches the system specifications and intended application.
  2. Mounting the Pump:
    • Secure the pump base to a solid, flat surface to prevent vibrations during operation.
    • Align and support the suction and discharge piping to avoid excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides for easier maintenance and servicing.
  3. Piping Connections:
    • Ensure piping matches the pump’s 1.5" ANSI 150# flanged connections.
    • Install proper gaskets to prevent leaks, ensuring they do not obstruct flow.
    • Remove protective covers or caps from the flanges before installation.
    • For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
  4. Electrical Connection:
    • Have a certified electrician verify that the electrical supply matches the motor’s specifications (2 HP).
    • Ensure proper motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
    • If rotation is incorrect on a three-phase motor, reverse any two leads to correct it.
  5. Priming the Pump:
    • Remove the fill plug and use a funnel to fill the pump casing with water.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
  6. Initial Testing:
    • Open the suction valve fully and partially open the discharge valve.
    • Apply power to the motor and monitor for smooth operation without noise or vibration.
    • Gradually open the discharge valve to achieve desired operating conditions.
  7. Safety Precautions:
    • Never operate the pump without water to avoid damage to internal components.
    • Replace coupling guards after installation to prevent injuries.
    • Ensure the pump is properly grounded and all connections are secure before starting.

Shipping, Warranty & Returns

Shipping is calculated at checkout by weight.

Orders ship direct from the manufacturer. We submit your order within 2 business days and email tracking as soon as it ships.

Estimated transit once shipped: 1–5 business days.

Alaska, Hawaii and Puerto Rico: ask us for a shipping quote.

Checkout offers this item to the contiguous 48 states and DC. For Alaska, Hawaii or Puerto Rico, use the shipping quote form or call 908-787-6030 and we reply by email with the delivered price. Nothing is charged until you accept.

Shipping details

1-year manufacturer warranty. We handle the claim for you from start to finish. Crystal Quest warranty terms

Start a warranty claim

Contact us for a Return Authorization (RMA) before sending anything back. We can't accept returns without one.

  • Start your return within 30 days of delivery. Approved returns carry a 30% restocking fee. Reverse osmosis systems, filter cartridges, membranes and media can't be returned.
  • Items must be unopened, unused and resellable, with all original packaging and components. You pay return shipping.
  • Systems, filters, cartridges and membranes can't be returned once water has run through them or they have been installed. Hygienic products can't be returned once opened.
  • Damaged or defective on arrival? Contact us within 48 hours with photos and we arrange the return.

Return terms for Crystal Quest

Documents & Manuals